Send us site photos, panel info and a utility bill. You get a complete, AHJ-ready set: site plan, single-line diagram, NEC 220.87 load calc, panel schedule and labels. Your first set is free.
You stay the contractor of record. We do the drafting, calculations and paperwork so your crew can keep installing.
Address, photos of the main switchboard and route, panel schedule, 12 months of utility data, charger model and count.
Site plan, single-line, load calc, schedules, details and labels, plus a one-page review packet listing every check and open question.
Sign as contractor of record (BPC 6737.3). Where the AHJ requires a stamp, an independent California PE reviews and stamps.
If plan check comes back with comments on our drawings, we revise at no charge until the permit is issued.
Every number on the drawings comes from a rule engine built on the 2025 California Electrical Code (NEC 2023), so you get the same answer every time. Below: pages from our sample set (fictitious project).


Flat price per plan set, so you can put it in your bid. No subscription. Your first set is free.*
| Service | What's included | Price |
|---|---|---|
| Commercial EV plan set Level 2, 1–4 chargers | Full set + calc package, signed by you as contractor of record. 48-hour turnaround. | $450 |
| Commercial EV plan set Level 2, 5–12 chargers, or new panel | Same as above, including new panelboard, feeder and EVEMS sizing where needed. | $650 |
| Larger EV projects 13+ chargers, service upgrade, DC fast | Scoped and quoted per project, usually within one business day. | quoted |
| Battery storage plan set 50–500 kWh, with or without PV | Site plan with NFPA 855 separation, single-line & three-line diagrams, equipment and fire-code compliance notes. | from $650 |
| PE-stamped set | Review and stamp by an independent California-registered electrical engineer, where the AHJ requires one. | PE fee + $150 |
| Plan check corrections | Free on our drawings. For drawings by others: response letter + revised sheets. | $150 |
Rush (24 h) +30%. PE fees are quoted before work starts.
* First plan set free for new contractors: one per CSLB license, commercial Level 2 up to 12 chargers, signed by you as contractor of record. PE stamp fees, if required, are not included. Plan check corrections on our drawings are included until the permit is issued.
Tell us about your next commercial EV or storage job. We'll reply within one business day with the list of what we need. Or email howard@ampplans.com. Free-set terms.